| Location of performance / Site: | Hesse, Germany, Europe |
|---|---|
| Period: | Sep 2012 - Dec 2015 |
| Methods: | Ram core sounding, Groundwater sampling from existing monitoring wells, Preliminary examination, Risk assessment, Phytoscreening |
|---|
| Aufgabenfelder Boden- und Gewässerschutz: | Contaminated sites, Land recycling |
|---|---|
| Exploration stage: | Historical Investigation, Preliminary investigation, Detailed investigation, Sanierung, Remediation investigation |
| Exploration methods: | Exploratory boreholes, Sampling, Inspections, Soil soundings, Pumping tests, Document research, Analytics |
| Media: | Ground, Soil air, Solid rock, Groundwater |
| Pollutants: | BTEX, CHC / HVOC |
| Planning stage: | Detailed Design, Tender / Award, Consulting / preliminary planning, Permit Planning, Feasibility Study |